You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Absolute World

Datos del proyecto

Ubicación: Missisauga, Canadá

Two high-rise buildings which are 153 m and 178 m high

  • number of floors Tower South: 56
  • number of floors Tower North: 50
  • construction period: 2008-2011

Architect: Burka Varacalli Architects; MAD Studio

Requisitos

  • twisting elliptical floors throughout the total height
  • each of the two towers twists in a different way

Cliente

Premform Ltd., Toronto

Beneficio del cliente

  • safety for those working at the jobsite
  • construction time optimisation  to 5-6 day pour cycles
  • unaffected by wind and weather
Frank Colucci, General Superintendent and Sergio Vacilotto, Project Supervisor - Absolute World
Frank Colucci | Sergio Vacilotto
General Superintendent | Project Supervisor

We decided to use PERI RCS in this project for three reasons: safety for workers and for the traffic below, productivity to achieve one floor pour in 5 to 6 days and schedule improvement to avoid lost days due to wind or weather conditions.

Solución PERI

  • flexible and adaptable climbing protection panel with mobile hydraulic climbing
  • Absolute World I (south): projecting fixed climbing shoe to compensate for the offset between the floors
  • Absolute World II (north): oblique climbing protection panel during constant twisting