You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Eemshaven Power Plant

Datos del proyecto

Ubicación: Eemshaven, Países Bajos

Highly efficient coal-fired power station complete with a switchable biomass combustion facility with 1,600 MW capacity

  • 64 m long and 35 m high electric filters for flue gas desulphurisation
  • 4-year construction period, operational in 2014

Requisitos

  • Working scaffold for welding and insulation work
  • Realisation of working platforms in accordance with the highest quality standards

Cliente

Bilfinger Industrial Services Polska Sp. z o. o., Warsaw

Beneficio del cliente

  • High level of working safety for scaffold assembly and use
  • Good accessibility with a minimum of material utilisation
Eemshaven Powerplant, Daniel Kuceł, Site Manager
Daniel Kuceł
Site Manager

The collaboration with PERI is highly satisfactory for both Bilfinger as well as our client, and we have been able to meet all of the deadlines. For me, PERI UP stands for quality and ergonomics, not least due to the fact that the PERI UP scaffold construction could be optimally adapted  to ensure safe execution of the sound-proofing work.

Solución PERI

  • Working platforms and access means on the basis of adaptable PERI UP Flex modular scaffolding
  • Dividable scaffold bays as required for generous dimensioning with 3 m bays as the basis and optimal geometrical adjustments in 25 cm increments in the area of the components involved
  • Facade-side working scaffold using modular scaffolding with a guardrail in advance assembly